Sale!

Fiocchi 32 S&W Long Lead Wadcutter Ammunition FI32LA 100 Grain 50 rounds

Original price was: $9.60.Current price is: $7.12.

21 in stock

SKU: WLNOO854062 Category:

Description

  • Fiocchi Shooting Dynamics ammunition offers great quality and consistency for the high-volume shooter and hunter. Loaded with similar grain weights as the Exacta line, this ammunition is perfect for training and practicing with similar results at a much cheaper price. This allows you to shoot, plink, or hunt as much as possible. This ammunition is new production, non-corrosive, in boxer-primed, reloadable brass cases.

    Notes:

  • Packaging is marked “32 Wad Cutter 100 Gr. GZG”
  • Headstamp is G.F.L. 32 Wad Cut.

    Technical Information

  • Caliber: 32 S&W Long
  • Bullet Weight: 100 Grain
  • Bullet Style: Lead Wadcutter
  • Case Type: Brass

    Ballistics Information:

  • Muzzle Velocity: 730 fps
  • Muzzle Energy: 120 ft. lbs.

Fiocchi 32 S&W Long Lead Wad Cutter FI32LA 100gr LWC 50 per box

FI32LA,FI32LABRICK,FI32LACASE,FI32LAX

Fiocchi 32 S&W Long Lead Wad Cutter FI32LA 100gr LWC 50 per box